C1. Survey Studio as the controlled instrument factory
Survey Studio should be the single source of truth for item banks, instruments, languages, versions, display rules, consent, eligibility, recruitment links and response schemas. It is not the source of official benchmark numbers until data passes research controls. Each generated survey has an immutable instrument_hash, study_id, signed manifest and question-order policy. A published collection wave may not modify live item wording retrospectively.
| Component | Required function | Failure condition |
|---|---|---|
| Item bank | Item IDs, wording, domain, response type, polarity, version | Unversioned edits after launch |
| Instrument compiler | Create language/mode package with eligibility, consent, routing | Missing field or untranslated mandatory item |
| Response collector | Server-side validated submission with idempotency key | LocalStorage mistaken for central warehouse |
| Quality pipeline | Duplicate/bot flags, consent, mode, exclusion reasons | Synthetic and empirical rows mixed |
| Scoring service | Versioned server deterministic execution; signed result | Client-only score used as official score |
| Release manager | Approve/freeze edition, data dictionary, correction log | Unapproved publication updates |
| Access service | Tenant access, participant rights, research exports | Public admin routes with unguarded write/delete |
C2. Canonical research entity model
| Entity | Critical fields |
|---|---|
| Product | product_id; slug; display_name; construct; reporting_unit; direction; owner; status |
| Instrument | instrument_id; semver; question_hash; scale_definitions; dimension_spec; translations |
| Study | study_id; protocol_version; frame; geography; eligibility; ethics_approval; PI |
| Wave | wave_id; dates; sampling_plan; mode; invite log; consent_version |
| Submission | submission_id; respondent_token; data_origin; item responses; quality status |
| Score | score_id; submission_id; score_version; coverage; dimensions; overall or dual scores |
| Benchmark | release_id; cohort; approved estimate; effective n; interval; disclosure status |
| Publication | report_id; DOI/URL; freeze hash; signed approval; erratum links |
| Evidence | organisation_id; criterion_id; dated files; reviewer; provenance; audit trail |
C3. Example machine-readable instrument definition
A controlled manifest for each item must include: item_id, construct_id, dimension_id, display_order, language, exact_text, item_type, anchors, polarity, mandatory, NA_enabled, visibility_rule, source_version and retired_at. A developer must not infer reverse scoring from the question text. The same concept can be asked through distinct versions; identity must remain explicit.
Illustrative scoring pseudocode: validate manifest_hash; reject invalid consent or ineligible case; for each applicable item transform response; mark NA missing; test dimension coverage; if mandatory failures return INCOMPLETE; otherwise compute Dk then approved scale score(s); persist method/version hash, response provenance and calculation trace; return labelled result. No fielded sample is included in this handbook.
C4. Unified research portal UI and information architecture
| Universal element | Implementation requirement |
|---|---|
| Product bar | Full name, canonical acronym, clear index direction, latest approved study version |
| Research status | Persistent DEMO / PILOT / ACTIVE / PROVISIONAL / PUBLISHED label |
| Score tile | Scale range, numerator meaning, period, denominator, uncertainty and data provenance |
| Methods drawer | Construct, item counts, transformations, weights, sampling frame, eligibility |
| Charts | Colour-independent interpretation, keyboard access, download with metadata |
| Survey experience | Consent, eligibility, save/resume where permissible, progress, NA option |
| Comparison | Same wave/compatible population or explicit harmonisation warning |
| Reports | Methods, sample, limitations and revision identifier embedded in exports |
| AI interpretation | Cited input figures, deterministic source, guardrails against invented benchmark claims |
| Navigation | Common brand/footer and return to central Research Hub; admin segregated |
C5. Crosswalks and naming consistency
| Legacy/ambiguous label | Canonical handling |
|---|---|
| CRI — Customer Rage Index | Retire as a public acronym; proposed new public product: CFRI; preserve migration aliases and citation history |
| CRI India™ — Customer Relationship Intelligence | Retain CRI India™ as distinct relationship instrument |
| SXEI™ — Service Excellence Intelligence | Do not use SXEI™ for Service Excellence; SXEI™ is Student Experience Index |
| Seven-factor NSEI and 11-dimension student dashboards | Seven executive student domains remain source taxonomy; detailed dimensions only through documented mapping and versioned scores |
| EXI and CXI same 0–100 output | Separate construct, target populations, scope and eligibility; no implicit parity |
| IntelliQ™ / Command Center “live national score” | Only reflect approved edition data; separate simulation and monitoring views |
C6. Release gates and exhaustive test suite
| Check ID | Non-negotiable evidence of readiness |
|---|---|
| SCI-01 | Signed protocol, owner and defined population exist |
| SCI-02 | Every questionnaire item mapped to dimension and immutable version |
| SCI-03 | Cognitive pretest and cultural/language review complete |
| SCI-04 | Documented sampling, recruitment and consent procedures |
| SCI-05 | Data origin cannot be changed from synthetic to empirical |
| SCI-06 | Deterministic score calculations independently tested |
| SCI-07 | Missingness, NA, weights and denominator tests pass |
| SCI-08 | Psychometric/assessor reliability evaluated for use-case |
| SCI-09 | Adequacy and disclosure suppression tested |
| SCI-10 | UI labels and references match canonical registry |
| SCI-11 | Dashboards never show invented historical editions |
| SCI-12 | Frozen public report data matches score service and charts |
| SCI-13 | Critical access, export, delete and cross-tenant tests pass |
| SCI-14 | Corrections, versioning and provenance demonstrably function |
| SCI-15 | Research head signs empirical publication release |
C7. Preliminary calibration and implementation programme
Stage 1 — Governance (weeks 1–3 indicative): approve canonical taxonomy and concept maps, choose accountable scientists, reconcile portal claims, quarantine demonstrations and sign data-handling standards. Stage 2 — Instrument development (weeks 3–8): expert review, cognitive interviews, translation and pre-registration. Stage 3 — Data and software (parallel): deploy registry, response backend, result service and auth. Stage 4 — Multi-site pilot (following approval): collect pilot samples, revise item banks and scoring; record changes. Stage 5 — Validation and publication: conduct main fieldwork only when powered, review uncertainty and quality, and release actual approved reports.
These are sequencing recommendations, not a claim of available staff, cost, external approval, or that any fieldwork has already occurred.
C8. Required deliverables per instrument before production
- Signed conceptual and construct map
- Questionnaire + fieldwork script + language adaptations
- Item and indicator data dictionary
- Sampling, quality and research ethics protocol
- Formula Book and independently run test vectors
- Validity/reliability/response-quality study report
- Benchmark release rules, suppression and uncertainty plan
- Report templates with correct interpretation and limitations
- Portal acceptance test evidence and security review
- Research-owner sign-off and public methodology summary
Source: CRMAA, Research Methodology Master Handbook, v1 · 15 October 2026. Reproduced as written; ™ added to product names. Handbook contents · How each instrument is built (live portals)